From booking to sign-off
1. Get in touch: tell us the inspection type and when it is required.
2. Set up your project: your project is loaded onto the Wally platform, which guides you through next steps.
3. Inspect on site: structured inspections at key stages, from pre-construction to completion.
4. Report and track: a digital report within 24 hours, with defects logged with photo evidence and tracked to close-out.
​5. Sign off: outcomes confirmed, with a traceable record kept in one place.
Ready to get started?
WHY IT MATTERS
WHY BUILDING INSPECTIONS ARE NOW CRITICAL
​24 hrs
Report turnaround
​5
Disciplines, one system
Building regulation has changed. Inspections, documentation and clear accountability are now essential to demonstrating compliance.
Building services inspections provide a traceable record of what was inspected, when, by whom and how issues were addressed. Missing records or incomplete inspections can lead to delays, compliance risks and regulatory action. WALLY helps teams capture inspections, evidence and documentation in one consistent, auditable system.
WHAT YOU GET
PROFESSIONAL, AUDIT-READY RECORDS.
Every inspection follows the same structure and is captured digitally, so you get a clear inspection report and a traceable record of what was inspected, when, by whom, and how issues were addressed.
01
Reports within 24 hours
Inspection reports are issued within 24 hours, so you can flag issues early, confirm outcomes and keep work moving.
02
Defect findings with photo evidence
Failed items are recorded with location, finding, recommendation and site photos, and tracked to close-out.
03
Audit support
A professional record of every inspection, to assist with Building Commission NSW audits.
